As a lot of things backfired in the first two shoots, this shoot wasn't any better. For starters, we started shooting an hour late. Then, this time, we wanted to have proper equipment, so we rented a camera gimble and we got some lighting equipment along with it.
First we shot the car scene. and for that we had to plan accordingly on point. This backfired, because we were unprepared. We had to improvise and kept shooting the same car scene over and over until we got it right. It was specifically difficult as the camera gimble was heavy and to hold it continuously for around an hour was not an easy job. (Credits to Rameen Osman).
It was getting late but we had a lot of work left to do so we shot the office scene. Or at least, we tried to.
No comments:
Post a Comment